Coordination Parameters

Coordination parameters for the current and upcoming IATA scheduling season

Runway System Capacity

Movements per

Arrivals

Departures

Total

60 min

20

15

28

10 min

4

3

5


PAX Terminal Capacity

Departing Passengers Throughput

  • TOTAL 690/hod
  • NON-SCHENGEN: 960/hod

Arriving Passengers Throughput

  • TOTAL: 1 290/hod
  • NON-SCHENGEN: 775/hod

Boarding gates

  • Terminal A: 8 gates
  • Terminal B: 5 gates

Baggage Reclaim Carousels:

4

NOTICE OF AIRPORT CAPACITY (NAC) CHART – WINTER DEPARTURES
NOTICE OF AIRPORT CAPACITY (NAC) CHART – WINTER ARRIVALS
NOTICE OF AIRPORT CAPACITY (NAC) CHART – SUMMER DEPARTURES
NOTICE OF AIRPORT CAPACITY (NAC) CHART – SUMMER ARRIVALS

Apron Capacity

Parking stands available in accordance with LZIB AIRCRAFT PARKING/DOCKING CHART – ICAO v AIP SR.

Slot Monitoring

Slots usage is monitored in line with IATA WSAG and WWACG Slot Performance Monitoring Guidelines against the following slots misuses:

  • Operations at a time different than the allocated slot,
  • Slot held but not operated,
  • Operations with no slot allocated,
  • Use of a slot in a different way than allocated (e.g. use of a different a/c type).